π§ Β‘ππ ππΜπ πππππππ ππππ ππ ππ πππππ π ππππ! #emape
Today we conducted a trial run on the new Grau Expressway to verify its operational conditions, safety, traffic flow, and usability before it opens to the public. π During this session, three Metropolitano buses traveled along the new infrastructure as part of the operational exercise. π·ββοΈ The inspection visit included the participation of the Mayor of Lima, Renzo Reggiardo; the President of the ATU (Urban Transport Authority), David HernΓ‘ndez; and the General Manager of EMAPE (Lima Metropolitan Area Infrastructure Management Company), Edgar Lara FloriΓ‘n. π The project, executed by EMAPE, is 95% complete and will strengthen the connection between the Metropolitano and Line 1 of the Lima Metro, benefiting more than 656,000 residents.

MTC Head reveals plan for transportation crisis!

The TRUTH about the Line 4 Branch and the MICAELA TBM

TRUMP Y EL PETRΓLEO: ΒΏQUΓ GANA VENEZUELA?

UPDATE: Vietnam 787 Lost Speed AFTER V1 | Captain Steeeve Explains

They were building ON TRASH and never realized it π¨

InauguraciΓ³n de obra en Barranco | 2 de setiembre

JANITOR vs THE BIGGEST GUY IN THE GYM. CHALLENGE Went Wrong

21 PERU Travel Tips for First-Timers (Learn from My Mistakes)

The connection between METRO and METROPOLITANO! | Via Expresa Grau and Central Station

Jay Leno Test Flies the Revolutionary Cirrus G3 Vision Jet! | Jay Leno's Garage

ESPECIAL | Marco Rubio aclara las claves del acuerdo petrolero con Venezuela

Lima Metro LINE 2 SHOULD be operating by DECEMBER: The challenge to the MTC and Rafael Rey

Cocky Attorney TAUNTS The Judge... MASSIVE Mistake!

Comprehensive Rehabilitation of ConchΓ‘n Bridge | July 7

Lima Metro, Line 1. What nobody tells you.

Β‘ASΓ LUCE HOY LA ALAMEDA CHABUCA GRANDA! / Enrejada y bajo control municipal (28 de Agosto 2026)

LIFE IN ROME WAS HELL - Santiago Castellanos | Aladetres 172

π₯ Is this the SOLUTION to one of Lima's biggest problems?

THE VΓA EXPRESA SUR STARTS ITS FINAL STAGE! π±
